2026–2036 execution model
Conservative, operator-controlled timeline for the complete transition from living blueprint to first operational multi-body infrastructure in the asteroid belt.
Inter-Planetary Link Ship Limited • Guildford, Surrey, UK
GitHub starter issues live, Contributors Welcome banner active, Section 7.1 value proposition published, first serious contributors engaged. Master Specification reaches v1.0.
Monthly Spec Jams, 100–300 active contributors, first daughter specifications, IPFS mirrors established. 1 000 human visitors milestone.
IPLS Guild/Foundation constituted. First physical golden-record editions. Early ASI validation of Lane A/B cards. First reference designs published.
ASI-level manufacturing available. First physical prototypes: mineral profiling probes, orbital manufacturing test platforms, small-scale ISRU demonstrators. Portal interface moves to Lane C validation.
First full asteroid mining campaign operational. First permanent hollowed-asteroid base reaches self-sustaining status. Interplanetary logistics network live. Milestone: First multi-body infrastructure (main base + daughter colony) established in the asteroid belt — fully operator-controlled and self-sustaining.